Sewer pipes are one of the indispensable infrastructures in modern urban life, responsible for discharging sewage, rainwater, and domestic wastewater from buildings and streets to municipal sewage treatment plants or natural water bodies. The connection of sewer pipes is a complex engineering process, involving multiple aspects such as pipe material selection, design, construction and maintenance. The correct connection method is not only related to the efficiency of the sewer pipe system, but also directly affects the environmental sanitation of the city and the quality of life of residents. This article will introduce How are sewer pipes connected, including pipe types, connection methods, construction processes and precautions.

How are sewer pipes connected
How are sewer pipes connected

Types of sewer pipes

Depending on the type of drainage, sewer pipes are mainly divided into three types: sewage pipes, storm water pipes and combined pipes. The design requirements and connection methods of each pipe are different.

Sewer pipes: Mainly responsible for discharging domestic sewage and industrial wastewater. Commonly used materials include PVC (polyvinyl chloride), HDPE (high-density polyethylene), cast iron and concrete.

Storm drainage pipe: Specially used to discharge rainwater to avoid the impact of water accumulation on the city. Storm water pipes usually use more corrosion-resistant materials such as PVC, PE, etc.

Combined sewer: A pipe system that discharges sewage and rainwater together. It is usually only used in some special circumstances, but its design and construction requirements are more stringent.

PVC Equal Tee

Connection methods of sewer pipes

There are usually the following connection methods for sewer pipes:

Plug-in connection: the most common connection method, usually used for plastic pipes such as PVC and PE. When plugging, the interface parts at both ends of the pipe are made into a mutually nested structure and sealed with a sealing ring or glue. This method is easy to operate and has good sealing performance, and is suitable for connections over shorter distances.

Flange connection: This connection method is common in pipes such as cast iron pipes and steel pipes. The flange connection fixes the flanges at both ends of the pipe together by bolts to form a sealing structure. Flange connection is usually used in places where disassembly or maintenance is required, and maintenance is convenient.

Welding connection: Mainly used for the connection of metal pipes (such as steel pipes and cast iron pipes). The joints of the pipes are heated at high temperature by welding equipment to achieve the effect of metal fusion and form a closed connection. This method is often used in pipeline systems with high pressure.

Clamp connection: The clamp connection is suitable for relatively small distances between pipes, and is often used for pipes that need temporary connection or disassembly during maintenance. The two ends of the pipe are fixed together by a clamp device, which is simple and easy to disassemble.

Plug connection: Plug connection is often used in plastic pipe connections. One end of the pipe is made into a plug shape, and the other end is made into a slot. After the two ends are plugged in, glue or sealing rings are used to ensure the sealing of the joint.

PVC 90 Degree Elbow
PVC 90 Degree Elbow

Construction process of sewer pipes

The construction of sewer pipes usually includes several steps: survey, design, excavation, installation and acceptance. The following is a general construction process.

1. Survey and design

Before carrying out pipeline construction, the project needs to be surveyed and designed first. This process needs to consider the direction of the pipeline, the selection of pipe materials, the slope of the pipeline, the location of the outlet, and geological conditions. Designers need to choose the appropriate type of pipeline and connection method according to actual needs.

2. Excavation

According to the design plan, the construction unit will carry out excavation work. Sewer pipes are usually buried underground. When excavating, it is necessary to ensure that the surrounding environment is not damaged or other underground facilities are affected. In order to avoid groundwater infiltration or ground collapse, the location of the pipeline should be reinforced after excavation.

3. Install the pipeline

When installing the pipeline, workers need to lay the pipeline according to the slope and direction required by the design. For each section of the pipeline connection, ensure the cleanliness and sealing of the connection part to prevent debris from entering the pipeline. For pipes that are connected by plug-in or clamps, workers must ensure the sealing of the interface to prevent water leakage.

4. Acceptance

After the construction is completed, the pipeline system needs to be inspected. During the acceptance process, the construction unit will check whether the pipeline is installed according to the design requirements, whether the pipeline interface is firm, and whether there is any leakage. Usually a water pressure test is carried out to ensure the pressure resistance and sealing of the pipeline system.

PVC Stub End

Precautions in sewer pipe connection

Sewer pipe connection is a project with high technical requirements and must be carried out in strict accordance with design standards and construction specifications. The following are some common precautions:

Material selection: It is very important to choose the right pipe material. Pipes of different materials have different requirements for connection methods and construction environments. For example, plastic pipes need to avoid high temperature environments, while metal pipes need to prevent corrosion.

Slope design: Sewer pipes usually require a certain slope to ensure smooth water flow. If the slope is too small, the water flow rate may slow down, which may easily cause pipe blockage; if the slope is too large, it may cause the water flow to be too fast and produce unnecessary impact force.

Interface sealing: The sealing of the connection part is a vital part of the pipeline system. If the seal is poor, it is easy to cause leakage, which will affect the drainage effect and may cause groundwater pollution or ground collapse.

Prevent pipe blockage: When connecting the pipe, special attention should be paid to the smoothness of the interface to avoid clogging the pipe due to foreign matter or impurities generated during construction.

 

The sewer pipe system is an important facility to ensure urban sanitation and environment. The connection method and construction quality of the pipe directly affect the operating efficiency and safety of the drainage system. From selecting appropriate pipes, designing reasonable connection methods to strictly controlling each link during construction, it requires careful planning and operation by relevant technical personnel. Only through scientific design and precise construction can the long-term stable operation of sewer pipes be ensured, effectively contributing to urban sewage treatment and environmental protection.